Client: The Province of North-Holland

In 2019 and 2020, the lock complex in Zaandam was renovated. Early 2020, both bridges connecting the city centre with western Zaandam were closed for several months. For pedastrians, cyclists and disabled, a temporary bridge was constructed. Floating pontoons and a long ramp created the temporary water crossing.