Client: Mammoet, Robbert Wynn & Sons Ltd.

During September 2012, heavy power train components were transported to Guernsey to increase the capacity of the island's power plant.

The tidal difference at the island is more than 8 meters and at low tide, the harbor falls completely dry. Therefore, high tide is required for both bringing the barge into the harbor and performing the unloading operation.